
Add to Cart
Welcome to inquiry our beer brewing equipment.
you'll get promptly reply.Cheers!
Beer Process:
Beer Brewing Equipment List
1 | malt milling system | malt miller machine grist case |
2 | Mash system | Mash tank/Boiling tank lauter tank Whirlpool tank |
3 | Fermenting system | Beer fermenters Bright beer tanks Yeast adding tank Accessories, such as sample valve, pressure gauge, safety valve and so on |
4 | Cooling system | Ice water tank Refrigerating unit Ice water pump |
5 | CIP cleaning system | disinfection tank & alkali tank &cleaning pump etc. |
6 | Controller | Control system, we have PLC automatic and semi-automatic, the elements brand include LG, Siemens and so on. |
7 | Keg filling system | Keg filling system ( keg washer and keg filler machine), the control system brand is Siemens. |
Malt Milling System
Malt crushing equipment used roller mill, distance adjustable. It is the most simple, a pair of drawing rollers, the two rollers during grinding relative rotation, the rotational speed of a roller is fixed, the other is adjustable. Operation to ensure malt evenly distributed over the entire roller, and feed rate is moderate, consistent feed rate.
Mash System
Zunhuang series mash system consist of 2 vessel mash system, 3 vessels mash system, 4 vessels and other design, mainly includes mash tank, brew kettle, lauter tank and whirlpool.
The main part of equipment in this system are made of SUS304, SS316 reaching international standard level.(Zunhuang company also can customized high quality copper equipment according to user place.)
Fermentation system:
The fermentation tank adopt cooling jacket and two-stage cooling refrigerant control mode at the cone and cylinder. So such design and cooling method to control the flow of the cooling liquid state in fermentation tank by the size of the two-stage cooling refrigerant flow. It will improve heat transfer efficiency and cooling rate, faster cooling, and reduce cooling costs and high economic efficiency equipment commercial operation.
Cooling System
Cooling system mainly includes Ice water tank, glycol water tank, plate heat exchanger, refrigeration unit, cooling pipe and valves and control system.
Control System
Control system is the core part in the whole beer production line, including: malt mash, mash, fermenting, cooling, temperature control, pressure control and other auxiliary. It can achieve the part control or whole PLC automatic control.
CIP Cleaning System
CIP cleaning system is consist of alkali tank, acid tank, sterilization water tank, disinfection tank, sanitary pump.
Part IV:Packing and shipping
1. Ocean shipment,railway shipment,express delivery.
2. No matter flat pack to save shipping cost,or fill with your merchandise into allassembled displays to ship together,all is up to you.
3. And we have our own department to arange the shipments.we ship worldwide dierctly by see,railway or express.we will provide all documents you need to import.
4. We packed the goods to meet the transport distance, shock, rust and anti-handling requirements damaged before shipping, to ensure the safe transport of goods to reach the buyer designated location before it is shipped.
1.After-sale Service for the whole life.
2. 24h service for you, solve your urgent problem first time.
3. 3 years warranty for the main products.
4. Free design for your brewery layout for 2D or 3D.
5. Spare parts replacement and repair service provided.
6. Engineer going abroad for installation, debugging and technical training if you need
7. Provide the Form E, CO, etc..others necessary reduce import Tax files for you.
8.To provide update information about brewing equipment technology once we test.
9.Help you send the goods if you have others company order, then send to you together.
10.Door to Door service, if you need any brewing parts.
Customer visit: